Global energy grids strained by surge in AI data centres and chip production

By admin In News, Technology No comments

Global energy grids strained by surge in AI data centres and chip production


Electricity consumption by data centres is set to double by 2030, while energy required for AI chip production soared by more than 350% worldwide between 2023 and 2024.


Electricity consumption by data centres is set to double by 2030, while energy required for AI chip production soared by more than 350% worldwide between 2023 and 2024.

Tanya Weaverhttps://eandt.theiet.org/rssNewshttps://eandt.theiet.org/2025/04/10/surge-ai-data-centres-and-chip-production-puts-strain-global-electricity-grids

Powered by WPeMatico